We appalled the actions DRA has taken to support cooler, cleaner water for the lower Deschutes River .
On May 13, 2016, the Deschutes River Alliance (DRA) sent notification to Portland General Electric (PGE) of DRA’s intent to file suit for violations of PGE’s Clean Water Act Section 401 Certification for the Pelton-Round Butte Hydroelectric Complex.
The Section 401 Certification sets out water quality requirements agreed to by PGE during the dam licensing process and embodied in a document titled “Water Quality Management and Monitoring Plan” (WQMMP). The Section 401 Certification is a required component of the Pelton-Round Butte Complex’s operating license (Federal Energy Regulatory Commission License No. 2030).
PGE’s own water quality reports provide evidence of violations of temperature, dissolved oxygen, and pH requirements at the Pelton-Round Butte Hydroelectric Project. The DRA has catalogued over 1,200 specific violations of the 401 Certification that have occurred since operations began at the Selective Water Withdrawal (SWW) Tower at Round Butte Dam on December 31, 2009.Read more about it here: https://deschutesriveralliance.wordpress.com/2016/05/16/deschutes-river-alliance-notifies-portland-general-electric-of-intent-to-sue/